Concrete volume calculator

Net volume, order volume, truck loads and cost for slabs, footings, walls and columns.

Concept and estimating tool. Check results and get a design by a qualified engineer for construction. Nothing you enter is stored or sent.

How it works

Volume = L x W x T for slabs, footings and walls, b x d x H for rectangular columns and π D2/4 x H for round columns, multiplied by the number of elements. The order volume adds the waste allowance. Truck loads are rounded up to whole loads.

Questions

How much waste should I allow?

Allowances of 3 to 10 per cent are common, depending on the element, formwork accuracy and pump line losses. Confirm with your supplier and project history.

What truck size should I use?

Agitator load sizes vary by supplier and site access. Enter the load size your supplier will deliver.

Module assistant

Concrete volume assistant

Type a question about this tool or the site work around it. Answers come from 20 questions written and checked by a Chartered Professional Engineer. No AI, nothing is sent or stored.

Try:

Top 20 questions

What does the concrete volume calculator do?

It calculates the concrete volume in m3 for slabs, footings, columns and walls, adds a waste allowance, then estimates the truck loads and cost. Use it to order concrete and check quantities. It gives an estimate, so the final order should be confirmed against the drawings and site conditions.

How is slab volume calculated?

Slab volume is length x width x thickness in metres, so 10 m x 8 m x 0.2 m is 16 m3. Convert millimetres to metres before multiplying. For slabs on ground, allow for thickened edges, beams and variation in the subgrade, which often add more than expected.

How is footing volume calculated?

For a strip footing, volume is length x width x depth. For a pad footing, it is length x width x depth for each pad, multiplied by the number of pads. Excavations for footings are often irregular, so add a margin for over-dig, especially in soft or sandy soil.

How are column and wall volumes calculated?

A square or rectangular column is width x depth x height. A round column is pi x diameter squared / 4 x height. A wall is length x height x thickness. Subtract large openings from walls. Include kicker heights where they form part of the pour.

How much waste allowance should I add?

Many projects allow about 5 to 10 percent, but it depends on the work. Footings in trenches, irregular excavations, pumped pours and small jobs usually need more than flat slabs. Check the specification and the supplier's guidance, and consider the cost of a short load against the cost of surplus.

How are truck loads and number of trucks estimated?

The calculator divides the total volume by the truck size, commonly 6 to 8 m3 for an agitator truck, but your supplier sets the maximum. It rounds up to whole trucks. Also check discharge time limits and the access to the site, as these can cut the usable load.

How is concrete cost estimated?

The calculator multiplies the ordered volume by your price per m3 and may add other items such as pumping and delivery. Prices vary with strength grade, aggregate size, admixtures, location and time of day. Get a current quote from the supplier. Short load, standing time and waiting charges can add significant cost.

What concrete strength should I order?

Order the grade, exposure classification and slump stated in the structural drawings and specification. AS 3600 Concrete structures sets durability and cover requirements, and AS 1379 Specification and supply of concrete covers the supply of the mix. Do not change grade on site without approval from the engineer.

What should I check on delivery of concrete?

Check the docket for the correct grade, slump, volume, batch time and additives, and match it to the order. Do a slump test and take test cylinders as required. Reject or hold any load that does not match, and record the time of arrival and discharge. Do not add water on site without approval.

Can I add water to a truck on site?

Not without approval. Extra water raises slump but cuts strength and durability, and can cause bleeding and shrinkage cracking. If workability is a problem, ask the supplier for a mix with a higher slump or a plasticiser. Any change must follow the specification and be recorded on the docket.

How long can concrete stay in the truck?

There is a time limit from batching to discharge, commonly about 90 minutes, but the specification and supplier docket set the real limit. Hot weather shortens the workable time. Plan the pour sequence so trucks do not queue on site, and agree a cut-off with the supplier. Reject loads that exceed the agreed time.

Do I need a concrete pump?

Use a pump when access is poor, the placing distance is long, or the rate must be controlled for walls and columns. Choose the boom or line pump to suit reach and volume, and confirm site access, set-up room and outrigger loads. The pump cost can be significant on small pours, so compare it with barrows or a chute.

How do I cure concrete properly?

Keep the concrete moist and protected from drying wind, heat and cold for the period required by the specification, typically using curing compound, wet hessian or plastic sheeting. Poor curing causes surface cracking and weak surfaces. Start curing as soon as the finish allows, and record the method and duration.

How do I deal with hot weather concreting?

Hot, dry and windy conditions speed up setting and cause plastic shrinkage cracking. Plan early morning pours, cool the mix if specified, dampen the subgrade and formwork, use fog or evaporation retarders where required, and cure immediately. Agree with the supplier about retarders and delivery spacing to avoid delays.

What testing is normally done on site?

Common tests are slump on delivery and compressive strength cylinders cast from sampled loads, following the AS 1012 series of concrete testing methods. The specification sets the sampling rate and the acceptance criteria. Label samples, keep them in the correct curing conditions and send them to a NATA registered laboratory.

What are the common mistakes when ordering concrete?

Frequent errors are ordering without a waste allowance, wrong unit conversions (mm to m), missing thickenings and beams, forgetting pump line volume, and ordering a load too small or too large. Check quantities from the drawings and compare with the calculator before booking. Recheck the area and depth after the excavation or formwork is complete.

What safety hazards apply when placing concrete?

Hazards include wet cement burns, manual handling, pump line whip, truck movements, formwork failure and falls from height. The WHS framework expects a risk assessment and safe work method statement. Use PPE, exclusion zones around pump lines and trucks, a traffic plan, and wash skin immediately if contaminated.

How do I check the quantity after the pour?

Compare the volume delivered on the dockets with the volume calculated from the formwork or as-built dimensions. A large overrun can indicate over-excavation, formwork movement or incorrect dimensions. Record the difference and investigate if it exceeds your normal tolerance, since it may point to a thinner section elsewhere.

When should I involve an engineer on a concrete pour?

Involve an engineer when the pour is mass concrete, has special durability or finish requirements, is placed in unusual conditions, involves a change of mix, or shows defects such as honeycombing or cracks. Also call if test results fail. Design changes on site need engineer approval. EcoDesign can prepare a certified design.

How do I allow for concrete lost in pump lines and spillage?

Add a small allowance for the volume left in the pump line, the hopper and any spillage, since these do not end up in the structure. The amount depends on the pump type and line length, so ask the pump operator. Order the allowance with your normal waste, and plan the last truck so the line is cleared without a large surplus.