Free site document templates

Toolbox talks, inspection and test plans, permits to work, a method statement outline and a daily site diary. Edit in the browser, then print or save as PDF.

About these templates

The toolbox talks cover excavation, formwork, reinforcement, concrete pours and crane lifts. The inspection and test plans cover formwork, reinforcement and concrete pours, with hold, witness and surveillance points. Permits cover excavation, hot work, confined space entry and lifting.

They are general starting points. Adapt them to your project specification, your principal contractor's system, the SWMS for high risk construction work and the WHS Regulations that apply to your site.

Module assistant

Site documents assistant

Type a question about this tool or the site work around it. Answers come from 20 questions written and checked by a Chartered Professional Engineer. No AI, nothing is sent or stored.

Try:

Top 20 questions

What templates are available in the free document tool?

There are toolbox talk, inspection and test plan (ITP), permit to work templates for excavation, hot work, confined space and lifting, a method statement outline and a daily site diary. They are editable in the browser, so you can fill them in, print them or save them as PDF.

How do I edit, print or save the templates?

Pick the document and topic, enter the project and author, click into any text to edit it, then use your browser's print command and choose Save as PDF or print on paper. Nothing is stored by the tool, so if you close or refresh the page, your entries are lost. Save the PDF before leaving.

Is any information I type stored or sent anywhere?

No. The templates run in your browser and nothing you enter is stored or sent by the tool. This also means there is no saved draft: if you close the tab or refresh, the content is gone. Save a PDF or copy your text elsewhere if you need to keep it. Do not enter anything you cannot manage on your own device.

Can I use the templates as they are for compliance?

Treat them as starting points. They must be adapted to your project, your risks, your client's system and the regulations that apply in your state. They are not legal advice or a substitute for a SWMS prepared for your actual work. Have a competent person review them before use.

How do I use the ITP template with hold, witness and surveillance points?

List each activity in order, with the specification or drawing reference, acceptance criteria, who checks it, the type of point (hold, witness or surveillance), and a record or sign-off column. Mark hold points where work cannot proceed without release, such as reinforcement before a pour. Complete it with real results as work progresses.

How do the permit to work templates work?

Each permit records the task, location, hazards, controls, people, isolation or testing, start and finish times and sign-offs. The issuer checks controls are in place before work, and the permit is closed out afterwards. Permits do not replace a SWMS, and confined space entry in particular must meet the WHS Regulations. Add site specific requirements.

What should a method statement outline include?

Typical headings are scope, references, roles and responsibilities, sequence of work, plant and equipment, materials, resources, hazards and controls, quality checks, environmental controls and emergency arrangements. Make it specific to the task and keep it short enough to be read. The outline is a guide and should be adapted to the client's requirements.

What should be recorded in a daily site diary?

Record date, weather, workforce numbers, plant, work done by area, deliveries, visitors, instructions received, delays and causes, safety events, inspections and any variations or claims matters. Write facts as they happen, with times and names, and sign each day. Photos with the diary add value.

What is a toolbox talk and how do I use the template?

A toolbox talk is a short briefing on a task, hazard or incident held with the crew before or during work. Use the template to record the date, topic, key points, who attended and how they confirmed understanding. Keep it specific to the work and follow up any actions raised by workers.

When is a SWMS required?

A safe work method statement is required for high risk construction work under the WHS Regulations, such as work with a risk of a person falling more than 2 m, work in trenches deeper than 1.5 m, work near energised services, and work in confined spaces. It must be prepared before the work starts and followed on site.

What is the difference between a SWMS, JSA, method statement and ITP?

A SWMS is the legal document for high risk construction work, setting out hazards and controls. A JSA (or JHA) is a task-level risk check, often done on the day. A method statement describes how the work will be done. An ITP lists quality checks and hold points. They serve different purposes and are often used together.

What must be in a SWMS?

A SWMS must identify the high risk construction work, the hazards and risks, the control measures, and how the controls will be put in place, monitored and reviewed. It must be specific to the job, and developed with the workers who do the work. It should be reviewed when controls are not effective or the work changes.

What is a hold point and who releases it?

A hold point is a stage where work must stop until a nominated person, such as the superintendent or engineer, inspects and releases it in writing. Examples are reinforcement and formwork checks before a concrete pour. Proceeding without release risks rejection of the work. Who releases it is set in the contract or specification.

What is the difference between a witness point and a surveillance point?

A witness point gives the reviewer notice and the chance to attend an inspection, but work can continue if they do not attend within the agreed time. A surveillance point is monitored by the reviewer through records or random checks. Only a hold point stops work. Check the contract for the exact definitions.

How often should toolbox talks be held?

No law sets one frequency. Many sites hold them at least weekly and at the start of new tasks, after incidents or when conditions change, as the project's safety plan requires. What matters is that the content is relevant, workers are consulted and attendance is recorded. Follow the principal contractor's system.

When is a permit to work needed and how long is it valid?

Permits are required for higher risk tasks as set by your site rules and the law, such as hot work, confined space entry, excavation, lifting near hazards and work on energised services. A permit usually covers one task, area and shift or time period, and must be closed out when work finishes. Follow your project's permit procedure.

How long do safety and project records need to be kept?

A SWMS must be kept until the high risk work is completed, and if a notifiable incident happens, for at least two years after the incident is notified. Other records, such as inspections, permits, training and the site diary, follow the regulator, the contract and company policy. Check your jurisdiction's requirements.

Why does the site diary matter as contract evidence?

A diary written on the day carries more weight than recollection when there is a dispute over delays, variations, instructions or extensions of time. Record facts, times, causes and who gave directions. Notice requirements in the contract may have strict time limits, so use the diary to support, not replace, formal notices.

What are common mistakes with SWMS and site documents?

Frequent faults are copying generic SWMS that do not match the task, not consulting workers, no sign-on, not reviewing after a change or incident, outdated forms and records filled in after the fact. Regulators and clients look for site-specific controls actually applied on the ground. Check documents against the work as it is done.

When should I get an engineer or safety professional to review documents?

Get one for lifting plans, temporary works, excavation support, high-consequence tasks and any time the controls rely on a calculation. A template cannot replace engineering design or specialist advice. EcoDesign can prepare a lift study or a certified design, and a safety adviser can check your SWMS against the WHS framework.